FY2022 Non-Point Source Pollution State Cost Share-Thomas County July1, 2021-June 30,2022
Practice | Component | UOM |
Well Decommissioning | Complete Practice – Casing < 10″” | Linear Foot |
Well Decommissioning | Complete Practice – Casing 10″” – 24″” | Linear Foot |
Well Decommissioning | Complete Practice – Casing 30″” – 36″” | Linear Foot |
Contour Buffer Strips | Complete Practice – Seed Mix # 1 | Acre |
Critical Area Planting | Complete Practice – Seed Mix # 1 | Acre |
Diversion | Earthwork | Cubic Yard |
Fencing | Wire – 4 Strand | Linear Foot |
Filter Strip | Complete Practice – Seed Mix # 1 | Acre |
Grassed Waterway or Outlet | Shaping | Acre |
Livestock Waste System – 100% | Engineering Fees – 100% | Each |
Mulching | Fabric Weed/Moisture Barrier – Roll | Linear Foot |
Pipeline | 1 1/2″” Dia Livestock Supply Pipeline 11/ – Combined Components | Linear Foot |
Pipeline | 1 1/4″” Dia Livestock Supply Pipeline 11/ – Combined Components | Linear Foot |
Pipeline | 1″” Dia Livestock Supply Pipeline 11/ – Combined Components | Linear Foot |
Pipeline | 2″” Dia Livestock Supply Pipeline 11/ – Combined Components | Linear Foot |
Pond Sealing or Lining – Bentonite | Bentonite – Ton | Ton |
Pond Sealing or Lining – Soda Ash | Soda Ash -Ton | Ton |
Sediment Basin | Earthwork | Cubic Yard |
Waste Storage Facility | Earthwork | Cubic Yard |
Water Well | Casing – 5″” | Linear Foot |
Watering Facility | Concrete – Gallon | Gallon |
Watering Facility | Fiberglass – Gallon | Gallon |
Watering Facility | Steel Rimmed – Gallon | Gallon |
Windbreak/Shelterbelt Establishment | Shrub | Shrub |
Windbreak/Shelterbelt Establishment | Tree – Bareroot | Tree |
Elimination of Abandoned OnSite Wastewater System | Complete Practice/Closure | Each |
OnSite Wastewater System | Complete System – Infiltration Chambers | Each |
Practice | Component | UOM |
OnSite Wastewater System | Concrete Tank – 1500 Gallon | Each |
OnSite Wastewater System | Earthwork – Cubic Yard | Cubic Yard |
OnSite Wastewater System | Pipe, 3″” Sch40 | Linear Foot |
Critical Area Planting | Complete Practice – Seed Mix # 1 | Acre |
Critical Area Planting Reseeding | Complete Practice – Seed Mix # 1 | Acre |
Fencing | Wire – 4 Strand | Linear Foot |
Forage and Biomass Planting | Complete Practice – Seed Mix # 1 | Acre |
Pipeline | 1 1/2″” Dia Livestock Supply Pipeline 11/ – Combined Components | Linear Foot |
Pipeline | 1 1/4″” Dia Livestock Supply Pipeline 11/ – Combined Components | Linear Foot |
Pipeline | 1″” Dia Livestock Supply Pipeline 11/ – Combined Components | Linear Foot |
Pipeline | 2″” Dia Livestock Supply Pipeline 11/ – Combined Components | Linear Foot |
Range Planting | Complete Practice – Seed Mix # 1 | Acre |
Range Planting Reseeding | Complete Practice – Seed Mix # 1 | Acre |
Water Well | Casing – 5″” | Linear Foot |
Watering Facility | Concrete – Gallon | Gallon |
Watering Facility | Fiberglass – Gallon | Gallon |
Watering Facility | Steel Rimmed – Gallon | Gallon |
Cover Crop | Complete Practice – Seed Mix # 1 | Acre |